Orsen was born from the will of two major players in the industry service to support developments and projects in Oil & Gas environment with designed and fitted solutions compliant, a highest levels of standards and strong requirements, whether they be HSE, Quality, Local Content, Schedule and Compliance.
Strategically located on the port of Dakar, Orsen has a workshop with a quayside access as well as the appropriate material resources to support Oil & Gas’s clients on all their projects.
Proof of its ambition, Orsen plans to invest US$5 million in the development of its infrastructure as well as in the development of its teams’ skills.
Sharing a sense of service and listening to customers, Teranga Oil&Gas and the ORTEC Group also share common values and a strong commitment to supporting and growing local skills.
Formed in 2016, Teranga Corporation is a main subsidiary of Alla Holding, a Senegalese group with a focus on Oil & Gas sector and Energy Services. Teranga Corporation is also the parent company of Teranga Oil & Gas Services.
Headquartered in Senegal and operating in the MSGBC basin, our ambition is to become a key player in EPC Projects and offshore maintenance services, using strategic and International integrated partnerships. Infusing considerable local content support and resources in our execution strategy will enable us to accomplish our goals while concurrently increasing competences of young Senegalese talent.
The Ortec Group is an engineering and construction solutions integrator, providing industrial players with customized turnkey services.
With project success at the heart of its ambitions, Ortec interconnects its expertise by relying on an agile and flexible operational structure common to its 5 business units: Global Services, Contracting France, Contracting International, Engineering and Energy.
The Ortec Group is thus able to respond to all of its clients’ problems and challenges, with the objective of creating value.
Since more than 40 years in Africa, and with permanent facilities in 15 countries, Ortec Group combines its multidisciplinary expertise, mobilization capacity on appropriate infrastructures and innovative equipment to provide integrated solutions, always with a local content optimization approach.
Well organized, reactive and possessing significant technical assets and a large production capacity, we provide our clients with supply solutions, production quality and logistics management.
ORSEN offers a large range of fabrication services such as :
well jumpers, manifolds, subsea trees, stools, riser towers, subsea mudmats, spools, gooseneck, pipeline end terminals, suction piles, umbilicals; tools and technical fabrications specifically developed for extreme condition equipment and structures.
We also support our customers on seafastening and logistics operations.
CLIENT: Schlumberger / Woodside
PROJECT: Crane Outrigger
LOCATION: Sangomar – Dakar
SCOPE:
CLIENT: SIA (Subsea Seven)
PROJECT: LBL Stand
LOCATION: Sangomar – Dakar
SCOPE:
Project excuted in Fast track (day & night)
CLIENT: SIA (Subsea Seven)
PROJECT: Goosneck Fabrication – Sangomar
LOCATION: Sangomar – Dakar
SCOPE:
CLIENT: SIA (Subsea Seven)
PROJECT: Goosneck Fabrication – Sangomar
LOCATION: Sangomar – Dakar
SCOPE:
CLIENT: SIA (Subsea Seven)
PROJECT: Fabrication of a 17T Clump weigth
LOCATION: Senegal
SCOPE:
CLIENT: SIA (Subsea Seven)
PROJECT: Fabrication of a 50T Grillage + Buoyancy Basket and various installation aids Fabrication
Total Weight : >100T
LOCATION: Senegal
SCOPE:
CLIENT: Tullow
PROJECT: JSE
LOCATION: Ghana
SCOPE:
Mobilization of 200 people over a period of 14 month.
Supply, prefabrication and assembly of subsea equipment and structures (manifolds, piles, goosenecks, mudmats, jumpers, grids) for the South-East extension of the Jubilee* field.
Almost 1200 tons of manufacturing.
CLIENT: SRI EMAS / ENI
PROJECT: Anchor ROP3
LOCATION: Offshore Cape Three Points (OCTP)
SCOPE: Subsea Structure 65T, Procurement of Material in Ghana, Fabrication at Workshop, Coating, Trial Lift and Load Test, Special Transport to Harbour, Load Out, Sea Fastening, 20,000 Manhours
CLIENT: OCEANEERING / BP
PROJECT: FPSO KAOMBO
LOCATION: Angola
SCOPE: 8 Suction Piles fabrication
CLIENT: TOTAL / TECHNIP
PROJECT: MOHO NORD
LOCATION: Congo
SCOPE: Engineering and Construction of a new yard dedicated to the fabrication of 50 Mudmats of 35 tons each and 128 LBL including the training and qualification of semi-automatic welding process.
With its significant capacity of mobilization, we support our clients for fabrication and installation activities for new structures as well as maintenance and shutdown activities.
We deliver to our clients a range of fabrication services dedicated to and including hookup activities and offshore shutdowns. These activities include work preparation, prefabrication, fabrication, electrical and instrumentation technician support, transportation and positioning, mechanical and equipments installation and completion, assembly, testing, sea fastening and maintenance.
CLIENT: Eiffage
PROJECT: BBL TOPSIDES TORTUE
LOCATION: BP Tortue Project in Senegal
DURATION: 5 months
SCOPE:
POB up to 22 pax
More than 30 people STCW Trained
CLIENT: Saipem
PROJECT: Hook up
LOCATION: BP Tortue Project in Senegal
DURATION: 2 months
SCOPE: Provision of senegalese offshore multi-alloy Welder for pipe
CLIENT: TRIDENT
PROJECT: ELON C Project
LOCATION: Equatorial Guinea / Cameroon
SCOPE: This project covers the Engineering, Procurement, Construction, and assistance to Installation of a Tripod platform. The tripod has one top deck, which accommodate the well intervention equipment (such as well head, gallow, navigation lights, power generator and the solar panels).
An intermediate level is designed for the boatlanding area. A boat landing will allow the personnel to climb on the tripod.
CLIENT: FOXTROT
PROJECT: Revamping PFA
LOCATION: Côte d’Ivoire
SCOPE: Revamping of the living quarters, firefighting network and various process and instrumentations devices.
Include also gangway fabrication and management of the vessels fleet during the first phase (80 days)
CLIENT: TOTALENERGIES
PROJECT: FSO KAOMBO NORTH and SOUTH
LOCATION: Angola
SCOPE: Engineering, Construction and Installation of produced water buffer drum.
CLIENT: TOTALENERGIES
PROJECT: FSO N’KOSSA OIL CHAIN
LOCATION: Congo
SCOPE: 8 months project from the engineering until the Shutdown : 45 Days Oil to Oil (160000 manhours)
Experts in onshore production exploration activities, we can provide you with tailored services: studies, project management and commissioning.
With strong participative experience on EPCC contract, skilled manpower labor, maintenance and piping and storage/tank fabrication.Our onshore activities covers the whole cycle project management and works, from engineering to commissioning.
CLIENT: SIA (Subsea Seven)
PROJECT: Sangomar Developpement
LOCATION: Dakar Harbour
SCOPE: Seafastening Works
CLIENT: FOXTROT
PROJECT: Pipeline Foxtrot
LOCATION: Ivory Coast
SCOPE:
Welding and installation of:
CLIENT: ENI / TECHNIP GHANA LIMITED
PROJECT: Onshore Receiving Facility (ORF)
LOCATION: Sanzule / Ghana
SCOPE: Piping, Site Erection, Mechanical, E&I, and Pipeline Construction, 100,000” of Piping, 3km Pipeline, 1,200T of Structure, 2,000T of Mechanical Equipment Installation, 150km of Cable laying
CLIENT: CHEVRON
PROJECT: Malongo dock upgrade
LOCATION: Angola / Cabinda
SCOPE: Jetty refection including all the structures, piping and ESI. We made all from the detail engineering to the pre commissioning. (it represent: 220 000 hours)
We are developing a wide range of services for our clients, with one aim: to offer solutions that are tailored to your activity, to contribute to availability, performance and the development of your installations.
CLIENT: SIA (Subsea Seven)
PROJECT: Fabrication of 15Ea 17T Bollards
LOCATION: Senegal
SCOPE:
CLIENT: SIA (Subsea Seven)
PROJECT: Fabrication of 15Ea 17T Bollards
LOCATION: Senegal
SCOPE:
CLIENT: SIA (Subsea Seven)
PROJECT: Fabrication of 2 New EFL and refurbishment 4 EFL (Total 6 x 8,5T)
LOCATION: Senegal
SCOPE:
CLIENT: TECHNIP/ BP
PROJECT: FPSO Hook up
LOCATION: France/China/Senegal
SCOPE:
Ongoing Training : Including BOSIET for Senegalese workforce
For more than four years now, the QHSE International department as well as the international agencies of the ORTEC Group have integrated a continuous improvement approach based on:
In this way, an integrated management system (IMS) was implemented taking into account the requirements of:
This IMS is developed in order to harmonize the practices implemented in the different entities of the International Department. It describes the general criteria and prescriptions necessary for the implementation, monitoring and continuous improvement of the quality, occupational safety and environment management system, for all the international activities of the ORTEC Group.
This IMS is currently deployed on all agencies and projects in the international department of the ORTEC Group and its effectiveness is recognized due to the obtaining of nine ISO and MASE certifications across its entire scope.
In order to ensure continuity of this IMS, a QHSE team is dedicated to the head office of the ORTEC group. Its role is to supervise, advice and evaluate the QHSE teams of agencies and projects and to promote the continuous improvement process by ensuring:
ABOUT ORSEN:
ORSEN follow the ISO standard (9001, 14001 and 45001), the Oil &Gas safety standard OGP 577 as well as the Ortec IMS.
ORSEN is committed to being ISO certified by the end of 2022.
Or HSE team will be composed of a HSE manager and a HSE Officer, with the priority to local content.
Ortec Group works with African collaborators since 1978, year of the first Friedlander branch office created in Africa, in Ivory coast.
Since then, the Ortec Group’s goal is to always strive at increasing the percentage of Local resources involved: educate, train and transfer skills and technologies to the subsidiaries.
With the willing to empower individuals to enhance their livelihoods and to contribute to the social and economic development of their society.
To implement a training program for employees to acquire the required skills and knowledge to develop themselves and improve their technology know-how and performance, thereby increasing productivity.
ORTEC Group works with African collaborators since 1978, year of the first FRIEDLANDER branch office created in Africa, in Ivory coast.
Since then, the ORTEC Group’s goal is to always strive at increasing the percentage of Local resources involved: educate, train and transfer skills and technologies to the subsidiaries.
With the willing to empower individuals to enhance their livelihoods and to contribute to the social and economic development of their society.
WELDING
TRAINING: SMAW FCAW-S
PIPING TECHNICAL KNOWLEDGE
TRAINING: Read & understand an isometric and a plan
218 collaborators trained
9572 hours of training and mentoring
119 hours of technical assistance